Roofing

Fixing roofing felt Fixing roofing felt Nailing roofing battens Tiles Tiles loaded on roof Lead work to box gutter Tiling the valley Tiling Fitting roof lights Pointing the ridge Tiles around flush P.V. panels Fiberglass balcony and box gutter Balcony covered in OSB before fibreglassing

By |2020-07-06T10:13:45+01:00June 16th, 2016|3. Superstructure, Self build timeline|

Passive slab foundation

Foundation for a Passive House A passive slab foundation is a raft that is fully insulated from contact with the ground below eliminating any thermal bridging. Insulation forms the shuttering for a concrete pour, and layering of the insulation allows a ring beam to be formed around the perimeter and thickening under load bearing [...]

By |2022-05-12T12:36:44+01:00May 24th, 2016|2. Groundworks, Self build timeline|

Disconnection & Moving of utility services

Disconnection of services Before the house can be demolished all of the utility services (Gas, Electricity, Water) need to be disconnected. Rather than pay for a disconnection and then again for a new connection later I decided to move them to the side of the garage so they would be out of the way. [...]

By |2020-10-02T15:27:34+01:00February 29th, 2016|1. Site Preparation, Self build timeline|